Task progress updates

Scheduling is not a one-time task and must be updated according to the actual progress during execution.
100% Browser local processing 0 Data upload

📅 One task per line

Number of tasks 0 | time range - | span days 0

💡 Instructions for use

  • There is one task in each line, with vertical bars separating the name, start date and duration in days; it is recommended to write the date as 2026-01-05 and add zeros.
  • Fill in the duration of the construction period instead of the deadline: the two have different meanings, and mixing them will make the length of the bar seriously inconsistent with the actual situation.
  • The daily basis is suitable for projects within two weeks, and the weekly basis is suitable for projects over a month; switching the scale only affects the display accuracy and does not change the filled in data.
  • When looking at the picture, first look at the gaps and gaps: side by side indicates that tasks are being carried out at the same time and may compete for resources. Gaps indicate that there is waiting and you need to confirm whether they have been reserved deliberately.

Scheduling is not a one-time task and must be updated according to the actual progress during execution.

Why update

The version you had on groundbreaking day quickly loses touch with reality.

Only by continuous backfilling can the picture have reference value.

What to update

If completed, fill in the actual end date and time.

The current progress will be filled in for work in progress, and the work not yet started will be kept as planned.

Discover delays

Compare plans with actuals to identify delayed tasks.

Go down the dependency chain and identify which post-tasks are affected.

Adjustment method

Postpone the affected tasks, or add resources to compress the subsequent construction period.

After adjustment, recheck resource usage conflicts and critical paths.

Update rhythm

It is recommended to update once a week, and important nodes should be updated at any time.

Keep one version of the record for each update to facilitate review and estimate deviations.

Update according to the actual progress during execution so that the diagram has reference value; remember to review dependencies and conflicts after updating.

📖 Glossary

Gantt chart
A schedule chart that uses horizontal bars to indicate when each task will start and how long it will last. The horizontal axis is time, the vertical axis is tasks, and the length of the bar corresponds to the duration, so you can see at a glance which tasks are in progress at the same time and which are waiting.
Task bar
The horizontal bar in the figure represents a single task. The starting point is the start date and the length is the duration. The misaligned relationship between the bars reflects the order of tasks. When reading the picture, first look at the overall misalignment, and then confirm the specific date line by line.
Construction period
The length of time a task takes from start to finish, often measured in days. It is different from the deadline: the construction period is how long it lasts, and the deadline is the latest time it will be completed. The two need to be confirmed separately. Mixing them will cause the overall schedule to shift.
start and end date
Two endpoints derived from the start date and duration. When filling in the form, only write one of them, and the other can be calculated; when filling in the forms at the same time and conflicting with each other, one of them should prevail to avoid a negative length bar.
Dependencies
A sequence constraint between two tasks, for example, the latter must wait until the previous one is completed before it can start. Diagrams are usually indicated by connecting lines or adjacent locations. Ignoring dependencies will cause the schedule to appear feasible, but when it is actually executed, it will wait everywhere.
milestone
Key nodes with zero construction period, such as review approval or version launch. It is usually drawn as a dot or diamond on the diagram to mark the stage boundaries and is easier to identify than the task bar.
critical path
The set of tasks that determine the minimum total duration of the project. Its characteristic is that any delay in any link will directly delay the overall completion time. Therefore, when resources are limited, priority should be given to ensuring tasks on the critical path.
Parallel tasks
Tasks that overlap in time are reflected in the graph by multiple horizontal bars appearing in the same time period. A high degree of parallelism indicates a compact arrangement, but it is also necessary to check whether the same person in charge is occupied at the same time.
time scale
The units on the horizontal axis can be divided into days, weeks or months. The finer the scale, the more precise it is, but the wider the graph is; projects with a longer span are usually divided into weeks or half-months, taking into account both readability and accuracy.
buffer time
Deliberate gaps left before and after critical tasks to absorb delays. A schedule that is fully calculated may seem tight, but in fact a slight surprise will lead to chain delays, so a margin of 10% to 20% is usually left on the critical path.
resource conflict
A person or device assigned to multiple tasks at the same time. Conflicts that cannot be seen on the diagram are most likely to break out during the execution phase. Therefore, after the scheduling period is completed, you should check line by line to see if the occupation of the same resource overlaps.
Plan versus actual
Superimpose the original plan bar and the actual execution bar on the same picture to make it easier to see where the deviation occurs. The prerequisite for comparison is that the task names and calibers on both sides are consistent, otherwise the differences will be difficult to attribute.

🔗 All keywords and tutorials

Keywords page of the tool12a

Return to tool home page

❓ FAQ

How to fill in the construction period?
Fill in the number of days, for example, write 3 for three days; the duration refers to how long it lasts, not the deadline.
Are there any requirements for date format??
It is recommended to write 2026-01-05, with the month and date padded with zeros, and the analysis result will be the most stable.
Can I view it by week??
Yes. Switching the scale will display it by week, which only affects the accuracy and does not change the filled in data.
Can you see the parallel tasks??
Can. Tasks that overlap in time appear as side-by-side bars within the same time period.
Will the data be uploaded??
No. All parsing and drawing are completed locally in the browser, and no upload request is initiated.
Can it be printed??
Yes. Copy the text version or print the page directly, suitable for meetings and postings.